Tometczak Residence
Mr. Tometczak had a finished basement that was ruined by ground water seepage. The wood framing, drywall, wood base molding, and flooring were moldy from getting wet and from high humidity. Mr....
View ArticleStarner Residence
Before finishing their basement in 2010, The Starner's decided to call Thrasher Basement Systems to waterproof their basement. The Starners needed extra living space for their family and wanted to make...
View ArticleSabatka Residence
Mr. and Mrs. Sabatka have lived in their home for 14 years. It is a 1950's era ranch style home with 1,200 square feet. The house had a vented dirt crawl space under the entire structure. The Sabatka's...
View ArticleCreative Center College in Omaha, Nebraska Invites Thrasher Representatives...
For the 3rd year in a row, Thrasher Vice President, Dan Thrasher was invited to speak at a Consumer Behavior class at the Creative Center College in Omaha, Nebraska. The class consists of third-year...
View ArticleFrancesca Peterson Joins Thrasher Basement Systems
On Friday, September 28th, Thrasher team members welcomed Francesca Peterson to our team in the role of Executive Assistant. Francesca comes to us from King & Brainard Sales Associates where she...
View ArticleTyson Foods, Inc.
A two-story building addition with a partial basement was planned at the existing Tyson Foods facility. The addition had approximate plan dimensions of 60 feet by 90 feet. Construction details included...
View ArticleAbraham Lincoln High School Addition
The Abraham Lincoln High School was built in 1960 with construction consisting of poured concrete foundations, steel framing and masonry block walls. A renovation and three additions were planned in...
View ArticleHoliday Inn Hotel and Water Park
The new Holiday Inn Hotel and Water Park was constructed just north of downtown Omaha, north of the Qwest Center and north of the new baseball stadium built for the College World Series. The project...
View ArticleVerizon Data Center
An addition was planned for the existing Verizon Data Center building. The addition would be located within the paved area north, east and west of the existing loading docks. An existing concrete...
View ArticleI-80 Box Culvert Extension
The Interstate 80 (I-80) corridor between Omaha, NE and Lincoln, NE is currently undergoing several phases of reconstruction that includes road widening, new bridge overpasses, and new exit and...
View ArticleSt. Benedict's Catholic Church Addition
Built in 1861, St. Benedict's Catholic Church is the oldest brick Catholic Church in Nebraska. It is listed with the National Register of Historic Places.In 2005, various site and structural...
View ArticleRave Movie Theater
Plans to renovate vacated store space into a movie theater included removal of the entire superstructure with only the below-grade, lower level foundation walls to remain. However, before the main...
View ArticleUNO Criss Library Floor Reconstruction
The Criss Library at the University of Nebraska - Omaha was constructed in the mid-1970's. The three-story structure has a lower level that walks out to grade along the south wall line. The original...
View ArticleSt. Michael’s Church Addition
An addition was planned east of the St. Michael Lutheran Church sanctuary. The addition had plan dimensions of 40 feet by 90 feet and the design included a full basement 14 feet below the slab-on-grade...
View ArticleMetropolitan Community College
The perimeter improvements project included the construction of three (3) new signage elements/architectural landscape features. Two signage elements measure 30 feet by 5 feet and 20 feet tall. One...
View ArticleSacred Heart Church
Sacred Heart Church is a stone and brick structure built in 1897 and named to the National Register of Historic Places in 1983. A major renovation project began in 2009. In order to refurbish and paint...
View ArticleLeavenworth Lofts
A building was razed southwest of the intersection of Leavenworth Street and 14th Street for the construction of a new apartment building. Removal of the structure exposed the east exterior basement...
View ArticleAnderson Residence
The Andersons built their home on Storm Lake about 8 years ago. The contractor who built the home suggested a gravel based crawlspace with a complete air exchanger installed in the crawlspace. The...
View ArticleDale Residence
The Dales have lived in their home for 10 years. It is a 1940's era two story home with 1,700 main floor square feet. The house has a full basement under a portion of it and also has a room off of the...
View ArticleThrasher Customer Service Representative Welcomes Baby Girl
Jaclyn Casey, Thrasher Customer Service Representative and her husband, Connor, welcomed Leighton Faith Casey on Wednesday, October 3rd, 2012. Leighton weighed in at 7 lbs. 6 oz. and was 20 inches...
View Article