An addition was planned for the existing Verizon Data Center building. The addition would be located within the paved area north, east and west of the existing loading docks. An existing concrete retaining wall creates the northern limits of the proposed building area and provides grade separation between the higher elevation paved surface to the south and cooling tanks, piping and equipment to the north, approximately 12 feet lower in elevation. The west approximate 40 feet of the retaining wall had an obvious bow of approximately six inches at mid-span. With the proposed addition planned above this section of the retaining wall, there was concern that any additional deflection or movement of the wall could affect the new structure planned as close as 18 feet from the wall.
The existing 12-inch-thick, reinforced concrete retaining wall supports an unbalanced earth condition of 11 to 12 feet, but actually extends another 13 to 14 feet below the ground surface elevation on the north side of the wall; i.e., total wall height of approximately 25 feet. The wall was constructed to these depths to locate the wall footings below the then-proposed cooling tanks to be buried below the ground surface on the low side of the wall. Soil borings completed south of the retaining wall identified lean clay fill soils over stiff to very stiff native lean clays. The fill soils extended to depths of 13 to 28 feet and were reasonably compact with dry densities ranging from 99 to 105 pcf, moisture contents of 19 to 25 percent, and hand penetrometer test results generally greater than 6,000 psf.